As part of Chiltern Railways' Project Evergreen 2, the platform lines were upgraded to increase the line speed for through trains from 40 mph (64 km/h) to 75 mph (121 km/h).[3] and, in October 2007, work began on installing ticket barriers, which became operational on 10 March 2008.[citation needed]
In the early 2000s the station car park was made into a two-storey car park. In March 2008 the upper deck was closed for work to start on adding a third storey. This opened on 1 September 2008, increasing the total parking spaces to 696.[citation needed]