The Cormorant-class gunvessels (sometimes known as Eclipse-class gunvessels) were a class of 4-gun first-class gunvessels built for the Royal Navy in the 1860s. They were somewhat unsuccessful; intended for shore bombardment in shallow water, they exceeded their design draft by 50%. Seven of the 13 ships ordered were suspended, with 3 finished or converted as survey ships and the other 4 cancelled. Racehorse was wrecked after only 4 years, and those ships that were completed as planned had short operational lives, in some cases less than 10 years. The survey vessels (Myrmidon, Sylvia and Nassau) lasted longest, with the last ship of the class, Sylvia, being broken up in 1890.
Design
Propulsion
The first 6 ships had a 2-cylinder horizontal single-expansion steam engine provided by Robert Napier and Sons and rated at 200 nominal horsepower, driving a single screw. On trials these units developed between 689 indicated horsepower (514 kW) and 689 indicated horsepower (514 kW), giving speeds of about 11 knots (20 km/h).[2]Sylvia and Nassau were completed as survey ships and were powered by 150 nhp Humphreys and Tennant engines.[2]Myrmidon received a more powerful 200 nhp Humphreys and Tennant engine.[2]
In common with all other Royal Navy wooden screw gunvessels, the Cormorants were rigged as barques, that is with three masts, with the fore and main masts square rigged, and the mizzen fore-and-aft rigged.[3]
Construction
The first 6 ships were ordered from commercial yards (Money Wigram & Sons, C J Mare & Co and J Scott Russell), with fitting out to be done in the Royal Dockyards at Chatham (first pair) and Woolwich (last 4). A further batch of 4 ships (Sylvia - Myrmidon) were ordered on 5 March 1860 and another batch of 3 (Pegasus - Guernsey) on 25 March 1862. The first completed ships had a draught of 11–12 feet (3.4–3.7 m), exceeding the intended 8 feet (2.4 m) by a considerable margin. Since gunvessels were intended to work in shallow water while bombarding the shore, work on the later two batches was suspended.[2]Sylvia, Nassau and Myrmidon were suspended in 1862 or 1863, but were resumed, with Sylvia and Nassau being finished as survey vessels.[2]Tartarus was broken up on the slipway in 1865, having cost £6,268 and work to Pegasus cost only £339. Guernsey was never laid down.[2]
Winfield, R.; Lyon, D. (2004). The Sail and Steam Navy List: All the Ships of the Royal Navy 1815–1889. London: Chatham Publishing. ISBN978-1-86176-032-6. OCLC52620555.