Planned underground BART stop
Downtown San José station [ 1] [ 2] is a proposed underground Bay Area Rapid Transit station underneath Santa Clara Street in Downtown San Jose , planned as part of Silicon Valley BART extension Phase II. The station would be co-located with the Santa Clara Valley Transportation Authority 's existing Santa Clara light rail station, and be located between the proposed 28th Street/Little Portugal station and a transfer station at San Jose Diridon Station . The station eventually connects to the proposed Santa Clara BART station.[ 3]
Revenue service, which will be served by the Orange and Green Lines, is envisioned to start in 2036.[ 4] [ 5]
History
The original plan for the Silicon Valley BART extension included the Downtown San José station, but full funding could not be secured[ 6]
and the San Jose extension was split into two phases. Phase I, completed on June 13, 2020, was the extension to Berryessa/North San José station .[ 7]
The proposed Downtown San José station is part of a later, unfunded phase II of the Silicon Valley BART extension[ 8] and would be located between the proposed 28th Street/Little Portugal and Diridon BART stations . Construction is planned to begin in 2024, and revenue service to start in 2036.[ 4] [ 5]
References
^ "Downtown San José Station" (PDF) . VTA’s BART Silicon Valley Phase ll Extension Project . Santa Clara Valley Transportation Authority . April 22, 2019. Retrieved May 11, 2019 .
^ "BART unveils system map for future Milpitas and Berryessa service" . Bay Area Rapid Transit. May 8, 2020. Retrieved May 31, 2020 . Wright, Bart (May 10, 2020). BART System Map (Map). Bay Area Rapid Transit. Retrieved May 31, 2020 .
^ BART Silicon Valley Fact Sheet Archived July 11, 2010, at the Wayback Machine . VTA, 2011.
^ a b "BART delays loom for downtown San Jose: BART timetable for downtown San Jose service now seen as 2030" . San Jose Mercury News . September 24, 2019. Retrieved October 10, 2019 . At one point, political and business leaders had anticipated BART service beginning in 2026 in downtown San Jose, but the new estimates from VTA point to a service launch more in the 2029 or 2030 time frame…
^ a b Handa, Robert (September 25, 2019). "New Design on BART Extension to San Jose Pushes Back Completion Date to 2030" . NBC Bay Area. Retrieved September 30, 2019 .
^ "Board Memorandum, Meeting of Jan. 8, 2009, item 20" (PDF) . VTA. Archived from the original (PDF) on March 14, 2012. Retrieved May 28, 2011 .
^ "VTA – BART Silicon Valley" . VTA. Retrieved May 28, 2011 .
^ ABC KGO-TV San Francisco (May 8, 2009). "South Bay BART initiatives move forward" . Archived from the original on June 29, 2011. Retrieved September 17, 2010 .
Current lines
Rapid transit Light rail Automated guideway transit
Stations