Share to:

Muttart stop

Muttart
Edmonton LRT stop
General information
Coordinates53°32′11″N 113°28′46″W / 53.53639°N 113.47944°W / 53.53639; -113.47944
Owned byCity of Edmonton
PlatformsSide-loading platforms
Tracks2
Construction
Structure typeSurface
AccessibleYes
History
OpenedNovember 4, 2023
Services
Preceding station Edmonton LRT Following station
Quarters
toward 102 Street
Valley Line Strathearn
toward Mill Woods

Muttart stop is a tram stop in the Edmonton LRT network in Edmonton, Alberta, Canada. It serves the Valley Line, and is located adjacent to the Muttart Conservatory, south of 98 Avenue, in Cloverdale.[1] The stop was scheduled to open in 2020,[2] but it officially opened on November 4, 2023.[3]

Around the station

References

  1. ^ "Valley Line LRT Maps". City of Edmonton. Retrieved July 9, 2017.
  2. ^ "Valley Line LRT" (PDF). City of Edmonton. September 2016. Retrieved July 21, 2017.
  3. ^ "Long-awaited Valley Line Southeast LRT officially opens to passengers". CBC. November 4, 2023. Retrieved November 4, 2023.
Kembali kehalaman sebelumnya