Part of the Pieman–Anthony Power Development scheme that comprises four hydroelectric power stations, the Tribute Power Station is the first station in the scheme, being the highest upstream, yet the last major hydro-electric power development in Tasmania.[2] The power station is located underground, below the 40-metre (130 ft)-high rock-filled concrete faced Anthony Dam and the adjacent 17-metre (56 ft)-high Anthony Levee, both across the Anthony River which forms Lake Plimsoll. Water from the lake is fed to the power station via a 7-kilometre (4.3 mi) headrace tunnel.[3]
The power station was commissioned in 1994 by the Hydro Electric Corporation (TAS) and the station has one FujiFrancisturbine, with a generating capacity of 84 megawatts (113,000 hp) of electricity. The station output, estimated to be 265 gigawatt-hours (950 TJ) annually,[1] is fed to TasNetworks' transmission grid via a 13.8 kV/220 kV Fuji surface generator transformer to the outdoor switchyard.[4]
Although the Tribute Power Station might have been the last major construction project of the Hydro Electric Commission of Tasmania, the 1,000 GWH Project has resulted in upgrades to component parts of existing superstructure operated by Hydro Tasmania.[5][6][7]