Part of the Derwent scheme that comprises eleven hydroelectric power stations, the Wayatinah Power Station is the sixth power station in the scheme and the second power station in the lower run-of-river system. The power station is located aboveground below Wayatinah Lagoon, a small storage created by the rock-filled Wayatinah Dam on the Derwent River below its junction with the Nive River. Water from the Derwent from Liapootah Power Station and spill from Liapootah Dam flows into Wayatinah Lagoon. Water in the lagoon is diverted by a 2-kilometre (1.2 mi)-long tunnel to two low pressure woodstave pipelines, each 1.3 kilometres (0.81 mi) long. It then descends 56 metres (184 ft) through three steel penstocks to the Wayatinah Power Station. The tunnel intake structure is provided with two vertical lift, gravity close intake gates designed to cut off full flow. Each of the three steel penstocks is provided with a hilltop valve designed to close under full flow.[2][3]
The power station was commissioned in 1957 by the Hydro Electric Corporation (TAS) and the station has three 15.3-megawatt (20,500 hp) English ElectricFrancisturbines, with a combined generating capacity of 38.3 megawatts (51,400 hp) of electricity.[4] Within the station building, each turbine has a fully embedded spiral casing and water flow is controlled by a spherical rotary main inlet valve and a turbine relief valve designed to prevent spiral casing overpressure. The station output, estimated to be 440 gigawatt-hours (1,600 TJ) annually,[1] is fed to TasNetworks' transmission grid via an 11 kV/220 kV three-phase English Electric generator transformer to the outdoor switchyard. An 11 kV indoor switchgear system also supplies a distribution yard that supplies power to the local area from Wayatinah village to
Hamilton and includes the power stations of Liapootah, Wayatinah, Catagunya, Repulse and Cluny.[2]